Capital Improvement Contractor Manhattan

We renovate occupied Manhattan co-ops and condos.

Occupied-building capital work

The shared spaces, upgraded with residents in place.

Capital work in a Manhattan co-op or condo lives in the common elements: lobbies, corridors, elevator banks, amenity floors, and the building envelope. Perennial Empire scopes that work around the reality that shareholders and unit owners do not move out, so phasing, access, and noise windows are planned before mobilization rather than negotiated mid-job.

  • Lobby, corridor, and elevator-bank renovation
  • Amenity and common-element upgrades
  • Building-wide painting and plaster restoration
  • Facade, roof, and Local Law compliance work
Walk Us Through Your Scope
New York City apartment buildings and towers.

Perennial Empire by the numbers

1,000s

Units turned per year

Founded in 2017, Harlem-based, working across all five boroughs. The same in-house crew that delivers our institutional work runs our co-op and condo capital improvements.

100+
Turns per month At peak production
12,000
Unit portfolios served Largest managed portfolio
$100M+
Interior work produced Affordable and market-rate interiors

What we handle for Manhattan boards and property managers

  1. Common-Area and Lobby Renovations

    Lobbies, hallways, elevator banks, and amenity spaces in Manhattan's prewar co-ops and postwar condos, phased to keep building operations running while shareholders stay in place.

  2. Building-Wide Painting and Capital Programs

    Corridor and stairwell repainting, plaster restoration, and multi-year capital plans scoped to a board's reserve schedule, with one in-house crew start to finish.

  3. Compliance and Filings

    DOB, HPD, and FDNY coordination with a licensed expediter of record, so open violations and Local Law deadlines do not turn into shareholder-assessment surprises.

Built for Manhattan boards

Our co-op and condo operating cadence

Manhattan's housing stock runs from prewar Upper East Side and Upper West Side co-ops to Midtown and Downtown condo towers and Mitchell-Lama cooperatives. The constant across all of them is that residents do not move out, so the work runs on a board's cadence, not the crew's convenience.

  1. Weekly Site Meetings

    Owner-architect-contractor meetings with the board liaison, managing agent, and our project manager. Notes circulated within 24 hours so the next decision does not wait on the next meeting.

  2. Board-Meeting Reporting

    A one-page construction update issued 72 hours before each board meeting covering progress, open items, and upcoming access needs, so the board conversation is informed rather than reactive to the last shareholder email.

  3. Shareholder Notices

    Lobby-posted weekly look-aheads, 72-hour notices for elevator takedowns and water shutdowns, and a bilingual site lead available during work hours. A dedicated PM email for shareholder questions that routes to us, not the managing agent.

  4. Alteration-Agreement Compliance

    House rules, elevator reservation policy, summer blackout schedules, and holiday restrictions pulled into the logistics plan before mobilization. Exceptions such as weekend crane picks or after-hours shutdowns routed through the board's pre-approval process.

  5. Planning a Manhattan capital project?

    Talk to a PM about your building.

    Request a Proposal

One in-house crew

Seven trades on staff, one point of accountability.

Perennial Empire self-performs painting, carpentry, drywall, tile, doors, general construction, and glazing with a 90+ W2 crew. On a Manhattan capital program that means the board works with one contractor from scope through punch list, not a brokered chain of subcontractors where every delay becomes a finger-pointing exercise.

  • 90+ W2 tradespeople, not a subcontractor list
  • Schedules built around a board's reserve plan
  • Weekly reporting the board can act on
  • One contract, board to punch list
Request a Proposal
Glass residential towers on the New York City skyline.

Manhattan co-op and condo questions

Do you renovate Manhattan co-op and condo buildings while residents stay in place?

Yes. Perennial Empire is an occupied-building renovation specialist. For common-area work such as lobbies, hallways, elevator banks, and amenity floors, shareholders and unit owners stay in place and keep full use of the building through a phasing plan that rotates work between wings, floors, or elevator banks so there is always a clear path in and out. We have renovated more than 3,000 occupied units across NYC.

How do you coordinate with a Manhattan co-op board and managing agent?

We run a structured communication triangle: board liaison, managing agent, and our project manager. Scope and budget live with the board, change orders under a pre-agreed threshold live with the agent, and day-to-day access scheduling lives with our superintendent. A weekly owner-architect-contractor meeting keeps everyone current, and for boards that meet monthly we issue a one-page update 72 hours before each meeting.

Do you handle alteration-agreement filings, DOB permits, and Local Law compliance for Manhattan buildings?

Yes. Permit filings go through our in-house project management team with a licensed expediter of record. For corporation-led or board-led work such as hallway renovations, facade, roof, and common-system work, we manage the DOB filings, inspections, and sign-offs, and we coordinate FDNY and HPD items so open violations and Local Law deadlines are handled inside the project rather than after it.

How do you schedule work around house rules, quiet hours, and elevator reservations in a Manhattan building?

House rules are a first-day input, not a change-order discovery. Before mobilization we pull the building's alteration agreement, move-in and move-out rules, elevator reservation policy, summer-schedule restrictions, and holiday blackouts into our site logistics plan. Deliveries are booked on the service elevator through the managing agent, noisy work is sequenced to the building's approved hours, and any exception goes through the board's pre-approval process.

Manhattan Capital Improvements

Request a Proposal for Your Building

Tell us about your Manhattan co-op or condo project. We will come back with a scope discussion, a walkthrough, or a proposal. Perennial Empire is an occupied-building specialist with 90+ W2 crew and seven in-house trades.

Request a Proposal