PACT converts NYCHA developments to project-based Section 8 and unlocks building-wide renovation while existing residents stay housed and regulated. Perennial Empire delivers occupied PACT work across Manhattan, Brooklyn, and the Bronx with a Section 3 certified, 90+ person W-2 workforce.
Manhattan Bundle: painting, LVT flooring, base molding, tile, amenity, framing, drywall, and plumbing/electrical finishes across 1,000+ occupied NYCHA apartments. 90% complete.
Trump Village 3: corridor renovations, 80,000 feet of LVT flooring installed, 250,000 feet of hallway plaster and paint.
Highbridge/Franklin & Twin Parks: occupied kitchen renovations, cabinet installations, unit painting, flooring, common area painting, door installations, appliance installations, and corridor renovation.
400+ apartments of occupied kitchen renovations across 15 buildings, plus common-area painting, door and appliance installs, and corridor work.
Corridor renovations at scale. 80,000 feet of LVT flooring installed and 250,000 feet of hallway plaster and paint.
900+ apartments of occupied painting plus amenity-space work including offices, community rooms, and corridors.

1,300+ occupied apartments painted across Brooklyn NYCHA developments, plus corridor painting, amenity spaces, and plaster work.

1,000+ occupied NYCHA units. Painting, flooring, appliances, and amenity-space work across corridors and common areas.
Resident-first delivery
Small crews work unit by unit with same-day completion on most interior scopes, HEPA-filtered dust containment, and belongings protected and documented with photos before and after. An on-site bilingual resident-services lead works across the crew, property manager, and NYCHA liaison through all work hours.
Section 3 hiring events held with residents' associations before mobilization. Bilingual resident notices (English/Spanish minimum), individualized access consents, and NYCHA-compliant site signage in all public areas before any unit entry.
Small crews per unit, same-day completion on most interior scopes, HEPA-filtered dust containment, and belongings-protection documented with photos before and after. Residents receive a named crew lead and a 72-hour notice window.
Monthly requisition package (G702/G703), certified payroll, Section 3 utilization, and a narrative progress report in NYCHA's required templates. Change orders logged, priced, and closed inside the requisition window, not held over.
An on-site bilingual resident-services lead works across our crew, the property manager, and the NYCHA liaison during all work hours. Complaints escalate on a documented path. Most resolve at the site level before they reach the agency.
PACT procurement?
Send us your scope and we will respond within one business day.
Request Prequalification PackageThe Permanent Affordability Commitment Together (PACT) program is a vital initiative by the New York City Housing Authority (NYCHA) aimed at improving the quality of affordable housing for residents. PACT converts NYCHA developments to Section 8 funding, ensuring long-term affordability and enabling comprehensive renovations in partnership with private development teams while keeping existing residents housed and regulated.
Section 3 reporting, certified payroll, OSHA 300 safety logs, and Section 3 utilization reports are standard deliverables. Section 3 certified W2 workforce on staff. All renovations meet NYCHA standards and guidelines, and reporting is delivered in the templates NYCHA and HUD already use. We do not require your agency team to teach us the format.
After PACT closing, the development sponsor and contractor typically mobilize for pre-construction within 30 to 90 days. Resident outreach, unit-by-unit condition assessments, Section 3 hiring events, and long-lead-time procurement run in parallel during this window. Active interior and common-area renovation usually starts within 90 to 180 days of closing, with the first resident-visible work (corridor painting, lobby refresh, exterior improvements) hitting the building inside the first six months. Timing varies with weather-sensitive scope (facade, roof) and any temporary-relocation decisions made at scoping.
A typical PACT bundle covers three layers: unit interiors (kitchen and bathroom refreshes, flooring replacement, painting, new appliances, plumbing and electrical corrections), common areas (corridor flooring and paint, lobby renovation, elevator modernization, amenity-space upgrades), and building systems (fire-alarm replacement, heating-plant work, envelope repairs, Local Law compliance). Not every PACT engagement touches every layer. Scope is defined at closing by the development's physical needs assessment and available PACT rehab dollars.
Resident communication is a jointly-managed responsibility with NYCHA, the PACT developer, and the property management team. We provide a dedicated on-site resident-services lead (bilingual where the development requires it), run building-wide notice cycles 72 hours before any access-required work, and staff a complaint-escalation path that resolves most issues at the site level. Media approvals (photography, video, press) run through NYCHA's communications office. We do not publish resident-facing photography without NYCHA media release, which is why our case-study photography lags active work.