Co-op capital improvements
Bring us in before the next board vote.
Send us your scope and meeting cadence. We will walk the building, scope the work, and come back with a line-item estimate your board can vote on.
Schedule a WalkthroughWhat we do
OverviewPACT ProgramProgramsMajor CapitalWhere we work
ManhattanBrooklynThe BronxQueensStaten IslandShareholder-occupied renovation
Most co-op capital projects happen while every apartment is occupied. Perennial Empire phases lobby, hallway, elevator-bank, and amenity work wing by wing so shareholders always have a clear path in and out, and the building keeps running on its normal schedule. We self-perform under all three labor regimes: open shop, prevailing wage, and union project labor agreements. The same in-house crew runs the work under whichever one your project requires.
Access coordination, notices, and milestone reporting that fits into board meeting cadences.
Lobbies, hallways, elevator banks, amenity spaces. Phased to keep building operations running.
DOB, HPD, FDNY: we coordinate inspections and corrections so open violations don't become shareholder-assessment surprises.
Built around your board
We write the governance into the schedule before mobilization: who approves what, at what dollar threshold, and on whose meeting calendar. A one-page construction update lands 72 hours before each board meeting, so the conversation is informed instead of reacting to the last shareholder email.
Owner-architect-contractor meetings with the board liaison, managing agent, and our project manager. Notes circulated within 24 hours so the next decision does not wait on the next meeting.
A one-page construction update issued 72 hours before each board meeting (progress, open items, upcoming access needs) so the board conversation is informed, not reactive to the last shareholder email.
Lobby-posted weekly look-aheads, 72-hour notices for elevator takedowns and water shutdowns, and a bilingual site lead available during work hours. A dedicated PM email for shareholder questions that routes to us, not the managing agent.
House rules, elevator reservation policy, summer blackout schedules, and holiday restrictions pulled into the logistics plan before mobilization. Exceptions (weekend crane picks, after-hours shutdowns) routed through the board's pre-approval process.
We run a structured communication triangle: board liaison (usually the president or building-committee chair), managing agent (day-to-day operations), and our project manager. Approvals are tiered: scope and budget live with the board, change orders under a pre-agreed threshold live with the agent, day-to-day access scheduling with our superintendent. A weekly owner-architect-contractor meeting keeps everyone current. For boards that meet monthly, we issue a one-page construction update 72 hours before each meeting so the conversation is informed, not reactive.
For common-area renovations (lobbies, hallways, elevator banks, amenity floors), no. Shareholders stay in place and keep full use of the building through a phasing plan that rotates work between wings, floors, or elevator banks so there is always a clear path in and out. Temporary-relocation scenarios only come up for full in-unit gut work that touches active plumbing or electrical service, and those are coordinated unit-by-unit with the shareholder and the board.
Yes. Permit filings go through our in-house project management team with a licensed expediter of record. For corporation-led work (hallway renovations, facade, roof, boiler, common-system work), the alteration agreement is between the co-op and the contractor, and we manage the DOB filings, inspections, and sign-offs. For shareholder-initiated alterations that overlap with building-wide work, we coordinate timing so scaffolding, noise rules, and trade access do not collide.
House rules are a first-day input, not a change-order discovery. Before mobilization we pull the building's alteration agreement, move-in/move-out rules, elevator reservation policy, summer-schedule restrictions, and holiday blackouts into our site logistics plan. Deliveries are booked on the service elevator through the managing agent, noisy work is sequenced to the building's approved hours, and any exception (weekend crane pick, after-hours shutdown) goes through the board's pre-approval process. This is why our phase of a co-op project rarely generates shareholder-complaint emails.
A resident-communication plan is part of our contract deliverables. It typically includes a pre-construction shareholder memo co-signed by the board and our PM, a lobby-posted weekly look-ahead, 72-hour notices for elevator takedowns or water shutdowns, a bilingual site lead available during work hours, and a dedicated email for shareholder questions that routes to our PM rather than your managing agent. Boards tell us this reduces the volume of 'what is going on in my building' emails by roughly an order of magnitude.